The second public announcement of the environmental impact assessment of the JA, BG-3 and D004-D new product upgrade projects of Chongqing Chunrui Pharmaceutical Chemical Co., Ltd.

The second public announcement of the environmental impact assessment of the JA, BG-3 and D004-D new product upgrade projects of Chongqing Chunrui Pharmaceutical Chemical Co., Ltd.

  • Categories:Company news
  • Author:
  • Origin:
  • Time of issue:2017-09-20
  • Views:0

The second public announcement of the environmental impact assessment of the JA, BG-3 and D004-D new product upgrade projects of Chongqing Chunrui Pharmaceutical Chemical Co., Ltd.

  In accordance with the "Interim Measures for Public Participation in Environmental Impact Assessment" (Huanfa [2006] No. 28) and the "Notice on Effectively Strengthening Risk Prevention and Strict Environmental Impact Assessment Management" (Huanfa [2012] No. 98) and other relevant regulations, Chongqing The relevant information on the environmental impact assessment of the new product upgrade project of Chunrui Pharmaceutical Chemical Co., Ltd. JA, BG-3 and D004-D will be announced.
  1. Project name and project summary.
  Project name: JA, BG-3 and D004-D new product upgrade project.
  Construction nature: industrial technological transformation.
  Construction site: The existing factory area of ​​Chunrui Company, No. 44, Luoxi Road, Luoqi Town, Yubei District, Chongqing.
  Construction unit: Chongqing Chunrui Pharmaceutical Chemical Co., Ltd.
  Total investment: 1.2 million yuan
  Area: 740 m2.
  Work system: four shifts and three operations, 240 hours (total 10 days) in JA years; 7200 hours (total 300 days) in BG-3 years; 600 hours (total 25 days) in D004-D years;
  Labor quota: No new employees, deployed by existing devices
  Construction plan: one year
  Main construction content: use the existing plant to carry out technical transformation of equipment, transform 30 equipment (sets) and supporting facilities, construct JA products (4-amino-3-methoxymethyl benzoate), BG-3 products ( Phthaloyl-L-alanyl-L-glutamine) and D004-D (2α-methyl-2β-(1,2,3-triazol-1-yl)methylpenicillin) One production line for sulfone-3α-diphenylmethyl carboxylate, forming an annual production capacity of 10 tons of JA, 50 tons of BG-3 and 20 tons of D004-D. Exhaust gas relies on the company's existing waste gas treatment facilities, and waste water relies on the company's existing sewage treatment facilities.
  2. The possible impact of the construction project on the environment and the preventive measures and measures
  1, ambient air
  Process waste gas pollutants of the project are mainly methanol, toluene, non-methane total hydrocarbons and a small amount of sulfur dioxide and hydrochloric acid mist. JA waste gas mainly contains methanol, toluene and non-methane total hydrocarbons. D004-D waste gas is mainly non-methane total hydrocarbons. After being collected, the existing 2# waste gas treatment facility adopts "PEG-400+sodium carbonate aqueous solution spray + paraffin oil extraction". After treatment, it is discharged by an 18m exhaust cylinder; BG-3 exhaust gas mainly contains methanol, toluene, non-methane total hydrocarbons and a small amount of sulfur dioxide and hydrochloric acid mist. After being collected, the existing 1# exhaust gas treatment facility adopts "PEG-400+ sodium carbonate aqueous solution" After spraying + paraffin oil extraction, it is discharged from a 15m exhaust tube. After the exhaust gas is treated, the concentration of sulfur dioxide, hydrochloric acid mist, methanol, toluene and non-methane total hydrocarbons can meet the corresponding standards of the Chongqing Comprehensive Emission Standard for Air Pollutants (DB50/418-2016), which has little impact on the local atmospheric environment .
  2, surface water
  Project wastewater is mainly JA centrifugal wastewater, BG-3 condensation wastewater, washing wastewater, absorption wastewater, centrifugal wastewater, D004-D extraction wastewater, washing wastewater, and floor washing wastewater, water ring vacuum wastewater, laboratory wastewater and exhaust gas alkaline washing Wastewater, the main pollutants produced are COD, ammonia nitrogen, SS, nitrobenzenes, anilines, dichloromethane, etc. The wastewater is discharged into the sewage treatment station and treated by the "iron-carbon micro electrolysis + hydrolysis acidification, anaerobic" treatment process Afterwards, it can meet the corresponding limits of the "Discharge Standard of Water Pollutants for the Chemical Synthesis Pharmaceutical Industry" (GB21904-2008). After the technical transformation, the amount of wastewater and pollutant discharge of the whole plant has been reduced, which is conducive to the improvement of the surface water environment.
  3. Groundwater
  All production equipment areas, tank farms, accident tanks, wastewater collection tanks, etc. adopt anti-seepage and anti-corrosion measures. Sewage pipes and material conveying pipes adopt "visual" design, and cofferdams and fire dikes adopt anti-seepage and anti-corrosion treatments. Under normal circumstances, the impact on the groundwater environment is small.
  4. Acoustic environment
  The noise of the project mainly comes from the operation noise of production equipment, which is concentrated in the production workshop. The noise source intensity of each equipment is generally small. By rationally arranging the noise source and adopting measures such as equipment shock absorption, sound insulation of the factory building, and greening of the plant week for high-noise equipment, the impact of workshop noise on the acoustic environment can be effectively reduced, and the project plant boundary can reach The "Environmental Noise Emission Standards at the Boundary of Industrial Enterprises" (GB12348-2008) requires category 2 standards, which have less impact on the acoustic environment.
  5. Solid waste
  Project JA device has sodium sulfate solid residue, waste palladium carbon catalyst, BG-3 device has methanol distillation residue, D004-D device has acetonitrile distillation residue, as well as sewage treatment station sludge, waste solvents from waste gas treatment facilities, waste gloves, cotton yarn, etc. , All belong to hazardous waste, the waste palladium-carbon catalyst is sent to the manufacturer for treatment and then recycled, and other wastes are sent to qualified units for unified disposal and not discharged. No new employees or household wastes will be added to the technological transformation project.
  In summary, the solid waste generated during the operation period of the proposed project meets environmental protection requirements after being disposed of and will not have a significant impact on the environment.
  6. Environmental risk
  The methanol raw materials of the technological transformation project are packed in barrels, and the storage capacity of other liquid raw materials is small, and the whole plant does not constitute a major source of danger. The risk prevention measures adopted are as follows: the installation area is equipped with a dike and a fire dike; the accident pool is equipped with anti-corrosion and anti-seepage measures; the installation area is equipped with a rain and sewage switch valve; an accident pool with an effective volume of 1000m3. The wastewater pipe network is designed for "visualization". With effective and reliable risk prevention measures and emergency plans, the environmental risks are acceptable.
  3. Key points of environmental impact conclusion
  The project is located in the company's existing factory area. The construction complies with the relevant national industrial policies and the "Chongqing City Industrial Project Environmental Access Regulations (Revision)" and other relevant regulations, and has good social, economic and environmental benefits.
  The wastewater generated by the technological transformation project is discharged into the Yangtze River after being treated by the "iron-carbon micro-electrolysis + hydrolytic acidification, anaerobic" treatment process at the existing sewage treatment station. The technological transformation project has no new sewage outlets, and the whole plant wastewater after the technological transformation Its pollutant emissions have been reduced, which is conducive to the improvement of the surface water environment; the project process waste gas is discharged through the exhaust tube after being treated by the waste gas treatment facility; the project's clean production level is at the domestic advanced level. Therefore, from the perspective of environmental protection, the construction of the proposed project is feasible and the site selection is reasonable.
  4. The method and time limit for the public to consult the simplified version of the environmental impact report, and the method and time limit for the public to request supplementary information from the construction unit or the environmental impact assessment agency entrusted by it when deemed necessary
  The time limit for the public to consult the simplified version of EIA: no less than ten working days from the first day of the second public announcement of the project
  Estimated starting time for public access to the full text of the EIA: September 18, 2017.
  The way the public can access the simplified and full texts of the EIA: both the EIA unit and the construction unit can access it.
  Construction unit and contact information
  Construction unit: Chongqing Chunrui Pharmaceutical Co., Ltd.
  Tel: 13635400462 Contact person: Li Zili
  Environmental impact assessment unit and contact information
  Chongqing Academy of Environmental Sciences Boda Environmental Protection Technology Co., Ltd.
  Certificate level: A; certificate number: National Environmental Assessment Certificate A Zi No. 3103
  Address: No. 252, Qishan Road, Ranjiaba District, Yubei District, Chongqing Postcode: 401147
  Contact person: Xu Jing Tel: 13677692502 Fax: 023-88521308
  Email: 904162969@qq.com
  5. Scope and main items for soliciting public opinions
  Scope: all the public who may be affected by the project, and all the public who have valuable opinions on the project construction or the environmental impact assessment conclusion.
  Main issues: The public is invited to provide comments on the reliability and feasibility of the engineering analysis, environmental status, environmental impact forecast, and evaluation conclusions in the report; especially the rationality, feasibility and effectiveness of the pollution prevention and control measures proposed in the report Give more valuable opinions and suggestions. If the public has other and better constructive suggestions for the project, please promptly submit them, we will actively adopt them and express our gratitude.
  Six, the specific form of soliciting public opinions
  Adopt methods such as publishing environmental information on the website and issuing public participation questionnaires to let the public fully understand the relevant content of the project's environmental impact assessment. At the same time, it will also conduct extensive communication with the public through on-site visits and inquiries.
  Seven, the start and end time of public comments
  From the first day of the second public announcement of the project, no less than ten working days.